Task: Review Technical Environment Design
The technical environment design prepared, must be reviewed and finalized in concurrence with relevant stakeholders.
Relationships
Main Description

All elements of the technical design must be collated and a review must be conducted of the Technology And Infrastructure Design. The Technology And Infrastructure Lead may involve experts from various technical components for conducting this review.

 

The review should typically include:

 

  • Verification of the design with respect to the requirements
  • Adequacy
  • Feasibility of the design
  • Cost Effectiveness
  • Interdependence of technical components. 

 

Risks with respect to the Technology And Infrastructure must be identified, documented and communicated to respective stakeholders.